With all the work to do putting the kitchen back together, the floor has been our first big challenge. As you've seen in the previous posts, we got the old floor out. The tile guy started this past week and so far, this is what we have.
He laid down all the cement board and then nailed it in place and sealed the joints/cracks in between the boards. He'll be back out for probably two more days to lay all the tile which is going in the entryway, kitchen and back hallway that leads to the garage.